Island Park Excavation
Dirt work in Island Park, Idaho, mapped from the primary sources — the operators, the rules, and the season that governs both
Call or text (208) 932-1140 — local line, free, a person calls back

Published

How many multi-unit homes have been permitted in Fremont County so far in 2026?

Short answer: From January through September 2026, Fremont County permitted 18 homes in 3-4 unit buildings and 23 homes in buildings with five or more units, against 8 and 14 in the same months of 2025 — Census Bureau permit counts, as of September 2026. These are homes authorized, not built or sold, and the count covers the whole county.

The counts, as of September 2026

MeasureValueAs ofSource
Homes permitted in 3-4 unit buildings, January-September18 units in 5 buildingsSeptember 2026U.S. Census Bureau, Building Permits Survey, Fremont County ID (estimates; county file downloaded 2026-11-06)
Same measure, a year earlier8 units in 2 buildingsSeptember 2025Same series and file
Homes permitted in 5+ unit buildings, January-September23 units in 3 buildingsSeptember 2026Same series and file
Same measure, a year earlier14 units in 2 buildingsSeptember 2025Same series and file

Both the 3-4 unit count and the 5+ unit count sit above their January-September 2025 marks. That is all the direction this page states: the series records what was permitted through September, and it says nothing about what happens next.

What the numbers mean for a dirt-work reader

How to read these counts

Questions people ask

  1. Does "permitted" mean these homes were built? No. A permit authorizes construction. The Census Bureau's survey counts homes authorized by building permits — not homes started, finished, or sold.
  2. Are these Island Park numbers? No. They cover all of Fremont County. The series has no town-level split, so an Island Park-only count does not exist in it.
  3. Why use January-through-September rows instead of one month? Monthly counts swing hard in a county this size — one multi-unit building changes the picture. The year-to-date rows are the steadier read for direction.
  4. Are the counts exact? They are Census estimates: the county file fills in estimates for places that do not report. Every figure prints with its series, period, and as-of date.
  5. When do the October 2026 numbers come out? The Census posts each month's county file about four weeks after the month ends, so October's file would be expected in late November 2026.

Planning dirt work on a lot?

Describe your job on the homepage form at islandparkexcavation.com, or call or text (208) 932-1140. Introductions go to a local dirt-work operator serving Island Park and Fremont County.

Where to read next