How many new homes did Fremont County permit in September 2026?
Short answer: Fremont County permitted 12 new single-family homes in September 2026 — up from 9 in September 2025 — per the U.S. Census Bureau Building Permits Survey, as of the September 2026 county print. Monthly counts this small swing; January-to-September is the steadier read: 129 permitted this year against 110 last year.
The numbers
| Measure | Value | As of | Source |
|---|---|---|---|
| New single-family homes permitted, September | 12 | September 2026 print | U.S. Census Bureau Building Permits Survey, Fremont County, ID |
| Same month, year earlier | 9 | September 2025 | Same series |
| New single-family homes permitted, January–September | 129 | Jan–Sep 2026 | Same series |
| Same period, year earlier | 110 | Jan–Sep 2025 | Same series |
| Full-year comparison | 126 (2025) · 130 (2024) | Full years | Same series |
Every figure is copied from the figures this site tracks, which come from the Census Bureau's county-level Building Permits Survey files — estimates with imputation for non-reporting places — downloaded November 6, 2026. None is retyped from memory.
What it means
- A permit is authorization, not construction. These are homes permitted — authorized to be built — not homes started, finished, or sold. The word on this page is "permitted," every time.
- One month is one point. In a county where summer permits run high, a 12-versus-9 September says direction, not level — which is why the table carries the January-to-September rows and why this site prefers the year-to-date and full-year rows for direction. The year so far: 129 against 110 in the same months of 2025; full years ran 126 in 2025 and 130 in 2024.
- The geography is the whole county. Every figure covers all of Fremont County, not Island Park alone. A county number is not a resort-area number.
Bias check, recorded: a single September is one point in a seasonal series (summer permits run high); the geography is county-wide, wider than Island Park; the figures are Census estimates with imputation for non-reporting places, not a full count; and permits are permits — nothing here says construction started.
Questions people ask
- Does 12 permits mean 12 homes were built? No — permitted means authorized to be built. None of these figures says a home was started, finished, or sold.
- Is this Island Park alone? No — every figure is Fremont County-wide. Island Park by itself is not broken out in this series.
- Why show January-to-September too? Small monthly counts swing in a county this size; the year-to-date and full-year rows are the steadier read on direction.
- Are these exact counts? They are Census Bureau estimates, with imputation for places that do not report.
- How does 2026 compare with earlier years? From the Census files: January–September 2026 at 129 against 110 in the same months of 2025; full-year 2025 was 126 and full-year 2024 was 130.
- When does October's number arrive? The Census posts each month's county file about four weeks after the month ends, and this site updates its figures when it does. This page makes no prediction — direction with sources, never a forecast.
Where to read next
- Why local dirt work runs on a five-month season — /excavation-cost-island-park
- When a project's own permits kick in — /the-one-acre-line-that-brings-in-the-epa
- Talk to a local operator — (208) 932-1140
Describe your job on the homepage form, or call or text (208) 932-1140.