Published
How many homes have been permitted in Fremont County so far in 2026?
The numbers
| Measure | Value | As of | Source |
|---|---|---|---|
| New single-family homes permitted, January–September | 129 (110 in Jan–Sep 2025) | September 2026 print | U.S. Census Bureau, Building Permits Survey, Fremont County ID |
| New single-family homes permitted, full year | 126 (130 in 2024) | 2025 annual print | U.S. Census Bureau, Building Permits Survey, Fremont County ID |
Every figure on this page is copied from the figures this site tracks, taken 2026-11-06 from the Census county files. Nothing is retyped from memory, and no number here is recomputed from another.
What it means for an Island Park build
- A permit is the front door to a build. The count is homes authorized by permit — the paperwork that comes before any dirt moves. The first nine months of 2026 authorized more single-family homes than the same months of 2025, so the county's construction pipeline at the permit stage ran larger year over year.
- Read the nine-month and full-year rows for direction. In a county this size a single month can swing the count, so the honest read is the like-for-like comparison — 129 against 110 — with the last two full years (126 in 2025, 130 in 2024) for the longer view. The two full years sit close together; the nine-month change is the one that stands out.
- Season is inside the number. Permits run higher in the building season, and January–September spans most of it. Both years' nine-month counts carry the same season, which is what makes them comparable.
Where the number does not reach
- Geography. The series publishes one number for all of Fremont County. It does not separate Island Park, so no figure on this page is an Island Park count.
- Permitted, not built. The Census counts homes authorized to be built — not homes started, finished, or sold. Nothing here measures completions.
- Estimates. The Census estimates these county figures with imputation for places that do not report. Treat them as estimates, not a ledger of every issued permit.
Questions people ask
Does "permitted" mean the home was built?
No. A permit authorizes construction. These are homes permitted — not homes started, finished, or sold — which is why this page says "permitted" every time.
Is this an Island Park number?
No. The series covers all of Fremont County in a single count; it does not split Island Park out. It is the county series this site tracks.
Are these exact counts?
They are Census estimates, with imputation for places that do not report — the survey's standard method for county files.
Why compare nine months instead of a full year?
2026 is not finished. January–September 2026 against January–September 2025 is the like-for-like comparison, and the table also carries the last two complete years (126 in 2025, 130 in 2024) for the longer view.
Does the count include apartments?
No — this page counts single-family homes. Homes in multi-unit buildings are tracked separately in the same survey; this snapshot does not use those figures.
When does this page update?
The Census posts each month's county file about four weeks after the month ends. When the figures behind this page are updated with a new print, this snapshot is refreshed — its dates move only with real change behind them.
Planning a build year around these numbers? The site's own pages carry the local specifics: excavation costs in Island Park, site prep for a cabin lot, and the county excavation and grading permit. Questions about a specific lot: (208) 932-1140.
---
By Kjel Jones, independent excavation & dirt-work researcher for Island Park · licensed Idaho real estate agent, LPT Realty