What should you check before buying land in Island Park?

Five documents answer most of it: the county's two slope thresholds (25 and 33.33 percent, Development Code section 5.12, retrieved August 19, 2026), the underground-utilities line in the building questionnaire (revised April 17, 2026), the snowplow criteria sheet, the FEMA floodplain screen on the county's application, and the right-of-way width. Check them before the offer, not after. (208) 932-1140.

Slope: the two numbers that decide buildability

Fremont County's Development Code sets two thresholds under its Critical Areas: Slopes heading, and they do different jobs. At 25 percent — one foot of rise in four feet of run — building is not permitted unless a geotechnical engineer certifies no significant hazard of slope failure or accelerated soil erosion. Above 33.33 percent — one in three — building is prohibited. (Fremont County Development Code, 2011 Edition, Ordinance 2011-04, section 5.12, consolidated through Ordinance 2026-03; retrieved 2026-08-19.)

Steep ground carries its own setbacks, measured from the slope itself: from the toe, half the slope height capped at 15 feet; from the top, a third of the height capped at 40 feet. Ground the county identifies as unstable goes to open space use. This site's slope guide puts the whole point in one line: the slope belongs in the diligence before the purchase, not in the first design review after it. The full treatment — measuring, certification, what a machine can and cannot fix — is on that page.

Utilities: the line that guarantees trenching

The building permit application's zoning questionnaire includes a line the applicant agrees to in writing:

"Utilities provided to your property must be underground. I agree" — Fremont County Zoning Questionnaire, building permit application (revised 2026-04-17)

For a buyer, that line is a budget fact: the service lines to a new structure go in the ground here, which puts trenching into nearly every new build — and trenching has its own rules, from the 811 notice window to how deep the trench goes. Neither question changes whether you buy; both change what the lot costs to develop.

Winter access: will anything plow this road?

Fremont County publishes a snowplow criteria sheet, and it is the document that decides which roads the county will and will not plow, using a 50-point rating bar (checked against the county sheet 2026-08-12, per this site's research pages). A lot at the end of a road the county does not plow is a different property in January than it is in the showing — the plow question and the contract alternatives each have their own page.

Flood zone: the blank on the application

The county's own excavation and grading application asks about it before any dirt moves: Section 3 of the form carries blanks for the FEMA floodplain zone and for slope brackets. The form is a screening question; the code is the standard — the application's slope brackets (15 to 30 percent, over 30 percent) do not line up exactly with the code's 25 and 33.33, which is worth knowing rather than glossing over. FEMA's flood map for Fremont County and the floodplain development permit each have a page of their own.

Access: the right-of-way width and the driveway permit

Two access facts travel with every Island Park parcel:

The five documents, in one table

DocumentWhat it decidesDetail
Development Code section 5.12 (retrieved 2026-08-19)Whether the ground is buildable at 25 / 33.33 percent, and the setbacksHow steep is too steep to build
Zoning Questionnaire (revised 2026-04-17)Underground utilities — trenching in the build's scopeHow deep utility trenches go
Snowplow Criteria Sheet (checked 2026-08-12)Which roads the county will and will not plowWill the county plow your road
Excavation & grading application, Section 3FEMA floodplain zone and slope screeningWhat FEMA's flood map shows for Fremont County
Appendix B, section 1.09 (amended 2020-07)Right-of-way width, easements, utility placementUtilities in the county right-of-way

Measuring before the offer

Slope is the item most often answered by eye, and the eye flatters. Percent slope is rise over run times one hundred — 25 percent is about 14 degrees, not 25 degrees, and the difference is the difference between a certification and a prohibition. Measure the ground where the structure would sit, not the parcel average, with a contour map or a survey; an operator's eye is good and is not a certification. Write each answer down with the date it was measured, so the figure in the file is one you can defend later — the diligence habit this whole site runs on.

Common questions

What slope is too steep to build on in Fremont County?

Two thresholds: at 25 percent, building needs a geotechnical engineer's certification of no significant hazard of slope failure or accelerated soil erosion; above 33.33 percent, building is prohibited. Section 5.12 of the Development Code, retrieved 2026-08-19.

Do utilities have to be underground on an Island Park lot?

The building application's zoning questionnaire makes the applicant agree: "Utilities provided to your property must be underground" (revised 2026-04-17). This site's research describes it as creating trenching work on nearly every new build.

How do you know whether the county will plow a road?

Fremont County publishes a snowplow criteria sheet that decides which roads it will and will not plow, using a 50-point rating bar — checked against the county sheet 2026-08-12. The plow question page carries the detail.

Does a flood zone change the dirt work?

It changes the paperwork first: the county's excavation and grading application screens for the FEMA floodplain zone in Section 3. Building in a mapped floodplain is its own permit question, with its own page.

What is the first document to pull?

The Fremont County Pre-Construction Check List (revised 2026-04-17) — it establishes the driveway-permit requirement for new county-road or highway access, and it is the shortest route to knowing which county thresholds a parcel trips.

How should slope actually be measured before an offer?

With a contour map or a survey, over the specific area where the structure would sit rather than across the whole parcel. Date the figure. Average parcel slope hides steep building sites on gentle ground and good sites on steep ground.