Island Park Excavation
Dirt work in Island Park, Idaho, mapped from the primary sources — the operators, the rules, and the season that governs both
Call or text (208) 932-1140 — local line, free, a person calls back

Published

How much do Fremont County's permits cost for grading a lot and cutting a driveway?

Short answer: Plan on two county fees: a minor Excavation and Grading permit at $100, printed on the application form, and a major (Class II) permit at $295.00 on the adopted fee schedule — a schedule dated 2011. The driveway application prints $50.00 and $25, unreconciled. The variable that moves your total most is whether the lot triggers the major, six-stage review.

What does the grading permit cost?

Before dirt moves, the county wants its permit: "Clearing, grading, excavating, dredging or filling ground in unincorporated Fremont County requires an Excavation and Grading permit from the county Planning & Building Department. The minor version costs $100 and the form states a 7–10 working day review." (islandparkexcavation.com/county-excavation-grading-permit, published 2026-08-27)

The published fee lines, exactly as quoted:

ItemAmountBasisSource
Grading permit, minor$100per permit — "printed on the application form itself"county form, via /county-excavation-grading-permit (2026-08-27)
Grading permit, major$295.00per permit — "on the adopted fee schedule — a Class II procedure"adopted fee schedule dated 2011, via /county-excavation-grading-permit (2026-08-27)
Driveway approach application$50.00 / $25per application — "a fee line reading $50.00, and a separate line reading $25 fee per application"county driveway application, via /the-driveway-approach-application-walkthrough (2026-09-16)
Utility locates (Idaho 811)$0per locate/excavation-cost-island-park (2026-08-15)
County time caused by your accessBilled to youper event/county-road-driveway-standards (2026-08-28)

How current? "The county's separately adopted fee schedule prices the same permit at the same amount, which is a useful cross-check on a schedule that is otherwise dated 2011." (same page, 2026-08-27) And confirm at the desk: "fees are set by those offices; confirm the current numbers when you file, and make the bid say who files" (/excavation-cost-island-park, 2026-08-15).

What moves the total?

Where the fee is paid

"The Fremont County Planning and Building Department, 125 N. Bridge St. Suite 1, St. Anthony, ID 83445. The form prints (208) 624-4643 for the office and (208) 624-1320 for the fax." (/county-excavation-grading-permit, 2026-08-27)

How do you get to a real number?

Treat the printed fees as the floor, not the budget: "So the honest way to describe the hundred-dollar figure is this: it is the price of the permit you hope you need." Then one question for whoever quotes the earthwork: "Ask whether the fee and the two-week review sit inside the quoted price or outside it." (both /county-excavation-grading-permit, 2026-08-27) To price lot work around Island Park with the filings included, call (208) 932-1140.

What the sources don't price

Questions people ask

  1. Is the $100 grading fee the whole permit cost? No — it is "the price of the permit you hope you need"; the scaled site plan and, on a major permit, six stages of review sit outside it. (/county-excavation-grading-permit, 2026-08-27)
  2. Why does the driveway application print two fees? The form prints "a fee line reading $50.00, and a separate line reading $25 fee per application" with nothing reconciling them — ask before you budget. (/the-driveway-approach-application-walkthrough, 2026-09-16)
  3. What pushes a lot from the $100 minor permit to the $295.00 major one? The source pages name both fees and the six-stage review, not the threshold — ask Planning and Building when you file.
  4. Do utility locates cost anything? No: "Utility locates are free. Idaho 811 marks buried lines at no charge, with the digger's notice due at least two business days ahead under Idaho Code § 55-2205" (/excavation-cost-island-park, 2026-08-15)
  5. Can the county bill me beyond the fee? Yes — "County time caused by your access is billed to you." (/county-road-driveway-standards, 2026-08-28)
  6. What does skipping the driveway permit actually cost? "So the exposure is not a fine. It is the removal of your access, at your cost, secured against your land." (/county-road-driveway-standards, 2026-08-28)

Where to read next